Ye Zhu, Xulong Wang, Xiangyu Chen. Evaluation of TBM Cutterhead’s Comprehensive Performance Under Complicated Conditions[J]. JOURNAL OF BEIJING INSTITUTE OF TECHNOLOGY, 2020, 29(3): 326-338. doi: 10.15918/j.jbit1004-0579.20029
Citation: Ye Zhu, Xulong Wang, Xiangyu Chen. Evaluation of TBM Cutterhead’s Comprehensive Performance Under Complicated Conditions[J].JOURNAL OF BEIJING INSTITUTE OF TECHNOLOGY, 2020, 29(3): 326-338.doi:10.15918/j.jbit1004-0579.20029

Evaluation of TBM Cutterhead’s Comprehensive Performance Under Complicated Conditions

doi:10.15918/j.jbit1004-0579.20029
Funds:the National Natural Science Foundation of China (51375001)
More Information
  • Corresponding author:lecturer, Ph.D. E-mail:zhuye198727@163.com
  • Received Date:2020-03-12
  • Publish Date:2020-09-30
  • A comprehensive performance evaluation method for the tunnel boring machine(TBM) cutterhead is proposed in this paper. The evaluation system is established on strength and vibration. Based on fracture mechanics theory, fatigue strength evaluation indices are determined under critical crack length. The concept of crack regions division is proposed to evaluate fatigue strength more accurately and specifically. In addition, the velocities in three directions of critical locations are obtained with dynamics equations. Then, the root-mean-square values of velocities are taken as the vibration severity indices. Taking the cutterhead of Jilin diversion engineering as an example, the evaluations of each index are completed; then, the vibration of the TBM cutterhead is measured and compared with the theoretical calculation results. There are similar change laws between the theoretical calculation results and the testing results of the cutterhead acceleration, which proves that the method of calculation of the vibration index is effective, the reliability of the cutter saddle welding should be paid attention to when the TBM is working, and the condition of vibration severity of the TBM cutterhead meets the requirements but needs to be improved.
  • loading
  • [1]
    Promotion Center for Science & Technology Achievements of Ministry of Water Resources. Full face rock tunnel boring machine(TBM)[M]. Beijing: Petroleum Industry Press, 2005. (in Chinese)
    [2]
    Samuel A E, Seow L P. Disc force measurements on a full-face tunnelling machine [J]. International Journal of Rock Mechanics & Mining Sciences & Geomechanics Abstracts, 1984, 21(2): 83−96.
    [3]
    Wang L, Kang Y, Cai Z, et al. The energy method to predict disc cutter wear extent for hard rock TBMs [J]. Tunnelling and Underground Space Technology, 2012, 28: 183−191. doi:10.1016/j.tust.2011.11.001
    [4]
    Zhang Q, Qu C, Kang Y, et al. Identification and optimization of energy consumption by shield tunnel machines using a combined mechanical and regression analysis [J]. Tunnelling and Underground Space Technology, 2012, 28: 350−354. doi:10.1016/j.tust.2011.12.003
    [5]
    Huo J, Wang W, Sun W, et al. The multi-stage rock fragmentation load prediction model of tunnel boring machine cutter group based on dense core theory [J]. International Journal of Advanced Manufacturing Technology, 2017, 90:277-289. doi:10.1007/s00170-016-9235-7
    [6]
    Huo J, Zhu D, Hou N, et al. Application of a small-timescale fatigue, crack-growth model to the plane stress/strain transition in predicting the lifetime of a tunnel-boring-machine cutter head [J]. Engineering Failure Analysis, 2016, 71: 11−30.
    [7]
    Huo J, Hou N, Sun W, et al. Analyses of dynamic characteristics and structure optimization of tunnel boring machine cutter system with multi-joint surface [J]. Nonlinear Dynamics, 2016: 1−18.
    [8]
    Huo J, Wu H, Yang J, et al. Multi-directional coupling dynamic characteristics analysis of TBM cutterhead system based on tunnelling field test [J]. Korean Society of Mechanical Engineers, 2015, 29(8): 3043−3058.
    [9]
    Grima M A, Bruines P A, Verhoef P. Modeling tunnel boring machine performance by neuro-fuzzy methods [J]. Tunnelling & Underground Space Technology, 2000, 15(3): 259−269.
    [10]
    Benardos A G, Kaliampakos D C. A methodology for assessing geotechnical hazards for TBM tunnelling—illustrated by the Athens Metro, Greece [J]. International Journal of Rock Mechanics & Mining Sciences, 2004, 41(6): 987−999.
    [11]
    Benardos A G, Kaliampakos D C. Modelling TBM performance with artificial neural networks [J]. Tunnelling & Underground Space Technology, 2004, 19(6): 597−605.
    [12]
    Zhao Z, Gong Q, Zhang Y, et al. Prediction model of tunnel boring machine performance by ensemble neural networks [J]. Geomechanics & Geoengineering, 2007, 2(2): 123−128.
    [13]
    Acaroglu O, Ozdemir L, Asbury B. A fuzzy logic model to predict specific energy requirement for TBM performance prediction [J]. Tunnelling & Underground Space Technology, 2008, 23(5): 600−608.
    [14]
    Yagiz S. Assessment of brittleness using rock strength and density with punch penetration test [J]. Tunnelling & Underground Space Technology, 2009, 24(1): 66−74.
    [15]
    Torabi S R, Shirazi H, Hajali H, et al. Study of the influence of geotechnical parameters on the TBM performance in Tehran–Shomal highway project using ANN and SPSS [J]. Arabian Journal of Geosciences, 2011, 6(4): 1215−1227.
    [16]
    Ghasemi E, Yagiz S, Ataei M. Predicting penetration rate of hard rock tunnel boring machine using fuzzy logic [J]. Bulletin of Engineering Geology & the Environment, 2014, 73(1): 23−35.
    [17]
    Yang J N, Salivar G C, Annis C G. Statistical modeling of fatigue-crack growth in a nickel-base superalloy [J]. Engineering Fracture Mechanics, 1983, 18(2): 257−270. doi:10.1016/0013-7944(83)90137-6
    [18]
    Yang J N, Hsi W H, Manning S D, et al. Stochastic crack propagation in fastener holes [J]. Journal of Aircraft, 2012, 22(22): 810−817.
    [19]
    Hang Hai. Reasearch on security evaluation method of port crane metal structure [D]. Wuhan: Wuhan University of Technology, 2008. (in Chinese)
    [20]
    He Jiawu, Fan Xinhai.Method and application of mechanical condition monitoring based on vibration severity[C]//2010 Vibration and Noise Testing Summit Proceedings, Beijing,China, 2010.(in Chinese)
  • 加载中

Catalog

    通讯作者:陈斌, bchen63@163.com
    • 1.

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(14)/Tables(7)

    Article Metrics

    Article views (594) PDF downloads(213) Cited by()
    Proportional views
    Related

    /

    Return
    Return
      Baidu
      map