Citation: | ZHANG Zhi-ming, WANG Yue, TAO Ran, YAN Fei, ZHOU Si-yong. Resource Allocation Using Timed Petri Nets and Heuristic Search[J].JOURNAL OF BEIJING INSTITUTE OF TECHNOLOGY, 2000, 9(2): 148-154. |
[1] |
Ahamad S , Li B. Robot control computation in microprocessor systems with multiple arithmeticprocessors using a modified DF/ IHS scheduling algorithm[J]. IEEE Transactions on Systems,Man, and Cybernetics , 1989 ,19 (5):1167-1178.
|
[2] |
Jiang C Q , Singh M G, Hindi K S. Optimized routing in flexible manufacturing systems withblocking[J]. IEEE Transactions on Systems , Man , and Cybernetics , 1991 ,21 (3):589-595.
|
[3] |
Magott J . Combining generalized stochastic Petri nets and PERT networks for the performanceevaluation of concurrent processes[Z]. 3rd Int Workshop on Petri Nets and Performance Models ,Los Alamitos , 1989. 249-256.
|
[4] |
Ashok K V K, Ganesh L S. Use of Petri net for resource allocation in projects[J]. IEEE Transac-tions on Engineering Management , 1998 ,45 (1):49-56.
|
[5] |
Murata Tadao. Petri nets : Properties analysis and applications [J]. Proceedings of the IEEE ,1989 ,77 (4):541-580.
|
[6] |
Desrochers A A , Al-Jaar R Y. Applications of Petri nets in manufacturing systems [M]. New York : IEEE Press , 1994.
|
[7] |
Lee D Y, Frank D. Scheduling flexible manufacturing systems using Petri nets and heuristicsearch[J]. IEEE Transactions on Robotics and Automation , 1994 ,10 (2):123-132.
|
[8] |
Jeng M D , Chen S C. Heuristic search based on Petri net structures for FMS scheduling [J].IEEE Transactions on Industry Applications , 1990 ,35 (1):196-202.
|