Citation: | MENG Xue-lei, JIA Li-min, QIN Yong, XU Jie, WANG Li. Calculation of railway transport capacity in an emergency based on Markov process[J].JOURNAL OF BEIJING INSTITUTE OF TECHNOLOGY, 2012, 21(1): 77-80. |
[1] |
Zhao Lizhen, Zhu Jiahe. Affects of using crossovers in section on high speed railway to carrying capacity of high speed railway section[J]. China Railway Science, 2002, 23(5): 11-17. (in Chinese)
|
[2] |
Hu Siji. Carrying capacity calculation of Federal German [J]. World Railway, 1991,3:18-20. (in Chinese)
|
[3] |
Abril M, Barber F, Ingolotti L, et al. An assessment of railway capacity [J]. Transportation Research Part E, 2008, 44(5): 774-806.
|
[4] |
Yang Zhaoxia, Yang Yudong. A Study on parameters for calculation block section carrying capacity and trains coefficient of removal on Beijing-Shanghai high speed railway [J]. Journal of Northern Jiaotong University, 2002, 23(5):11-17. (in Chinese)
|
[5] |
Chang H B. A simulation study of installation locations and capacity of regenerative absorption inverters in DC 1.500.V electric railways system [J]. Simulation Modeling Practice and Theory, 2009, 17(5): 829-838.
|
[6] |
Steven H. Capacity factors of a mixed speed railway network [J]. Transportation Research Part E, 2009, 45(5):830-841.
|
[7] |
Oliveira E, Smith M B. A Job-Shop scheduling model for the single-track railway scheduling problem, Research Report 2000.21[R]. Leeds,England:University of Leeds, 2000.
|