[1] 白思俊. 多资源约束的网络计划的启发式优化方法[J]. 系统工程理论与实践,1995, (7): 42-47.
[2] 杨永清, 许先云,等. 多资源约束下的工序排序准则及其优化[J]. 系统工程理论与实践,1995, (5): 28-31.
[3] 蒋根谋. 多资源约束下包含资源使用顺序关系最优施工计划的确定[J]. 铁道科学与工程学报,2005, 2(3): 56-62.
[4] 林琳, 姚郁. 多资源约束下的多项目作业调度问题研究[J]. 哈尔滨工业大学学报,2007, 39(7): 1045-1049.
[5] Shukla Sanjay Kumar, Son Young Jun ,M.K. Tiwari. Fuzzy-based adaptive sample -sort simulated annealing for resource - constrained project scheduling[J]. International Journal of Advanced Manufacturing Technology, 2008, 36(9-10): 982-995.
[6] J.F. Goncalves, J.J.M. Mendes, M.G.C. Resende. A genetic algorithm for the resource constrained multi -project scheduling problem[J]. European Journal of Operational Research, 2008, 189(3): 1171-1190.
[7] Homberger, J.. A multi -agent system for the decentralized resource - constrained multi -project scheduling problem [J]. International Transactions in Operational Research, 2007, 14(6): 565-589.
[8] Shou, Yongyi. A bi-directional ant colony algorithm for resource constrained project scheduling [A]. IEEM 2007: 2007 IEEE International Conference on Industrial Engineering and Engineering Management[C], United States, 2007: 1027-1031.
[9] Ozdamar,L., and Ulusou,G.. A survey on the resource-constrained project scheduling problem. IIE Trans., 1995, 27: 574-586.
[10] ARNE THESEN.运筹学的计算机方法[M]. 薛华成,译. 清华大学出版社, 1986:3.
[11] Christofides, N., Alvarez-Valdes, R., and Tamarit, J. M.. Project scheduling with resource-constraints: A branch and bound approach [J]. European Journal of Operational Research, 1987, 29:262-273.
[12] Genmou Jiang, Jonathan Shi. Exact algorithm for solving project scheduling problems under multiple resource constraints [J].Journal of Construction Engineering and Management, 2005, 131(9): 986-992.
[13] Fortunato Crespo Abril, Concepcion Maroto Alvarez. Scheduling resource-constrained projects using branch and bound and parallel computing techniques[J]. International Journal of Operational Research, 2005, 1(1-2): 172-187.
[14] Roland Heilmann. A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags[J]. European Journal of Operational Research, 2003, 144(2): 348-365.