[1] |
何海燕,单捷飞. 国外对华双反联动调查影响因素的实证研究[J]. bob手机在线登陆学报:社会科学版,2013,15(4):48-53. |
[2] |
侯静,刘伊生,朱海龙. 国际工程承包风险管理之风险识别[J]. 建筑经济,2013(7):22-25. |
[3] |
邓勋,龙标宇. 海外发电EPC总承包项目投标报价汇率风险评估与规避研究[J]. 建筑经济,2013(4):49-53. |
[4] |
Zhang W,Alon I. A guide to the top 100 companies in China [M]. Singapore:World Scientific Publishing Press,2010. |
[5] |
Globerman S,Shapiro D. Economic and strategic considerations surrounding Chinese FDI in theUnited States[J]. Asia Pacific Journal of Management,2009,26(1):163-183. |
[6] |
Quer D,Claver E,Rienda L. Political risk,cultural distance,and outward foreign direct investment:empirical evidence from large Chinese firms[J]. Asia Pacific Journal of Management,2011(13):1-16. |
[7] |
Birch D G W,McEvoy M A. Risk analysis for information systems[J]. Journal of Information Technology,1992(7):44-53. |
[8] |
Cutter S L. Social science perspectives on hazards and vulnerability science[J]. Geophysical Hazards,2010(1):17-30. |
[9] |
Ashley D,Bonner J. Political risks in international construction[J]. Journal of Construction Engineering and Management,1987,113(3):447-467. |
[10] |
Torre J,Neckar D H. Forecasting political risks for international operations[J]. International Journal of Forecasting,1988,4(2):221-241. |
[11] |
Kesternich I,Monika S. Who is afraid of political risk?multinational firms and their choice of capital structure[J]. Journal of International Economy,2010,82(2):208-218. |
[12] |
Baloi D,Price A D F. Modeling global risk factors affecting construction cost performance[J]. International Journal of Project Management,2003,21(4):261-269. |
[13] |
Ozorhon B,Arditi D,Dikmen I,Birgonul M T. Performance of international joint ventures in construction[J]. Journal of Management in Engineering,2010,26(4):209-222. |
[14] |
Zhang H. A redefinition of the project risk process:using vulnerability to open up the event-consequence link[J]. International Journal of Project Management,2007,25(7):694-701. |
[15] |
Deng X P,Low S P. Understanding the critical variables affecting the level of political risks in international construction projects[J]. KSCE Journal of Civil Engineering.(SCI). 2013. 17(5):895-907. |
[16] |
Han S H,Diekmann J E. Approaches for making risk-based go/no-go decision for international projects[J]. Journal of Construction Engineering and Management,2001,127(4):300-308. |
[17] |
Frynas J G,Mellahi K. Political risks as firm-specific(dis)advantages:evidence on transnational oil firms in Nigeria[J]. Thunderbird International Business Review,2003,45(5):541-565. |
[18] |
Alon I,Herbert T. A stranger in a strange land:micro political risk and the multinational firm[J]. Business Horizons,2009,52(2):127-137. |
[19] |
Kennedy C R. Political risk management:a portfolio planning model[J]. Business Horizons,1988,31(6):26-33. |
[20] |
Ramamurti R. The obsolescing"bargaining model"?MNC-host developing country relations revisited[J]. Journal of International Business Studies,2001,32(1):23-39. |
[21] |
Rice G,Mahmoud E. Political risk forecasting by Canadian firms[J]. International Journal of Forecasting,1990,6(1):89-102. |
[22] |
Low S P,Shi Y. Cultural influences on organizational processes in international projects:two case studies[J]. Work Study,2001,50(6):267-285. |
[23] |
Deng X P,Low S P. Understanding the critical variables affecting the level of political risks in international construction projects[J]. KSCE Journal of Civil Engineering, 2013,17(5):895-907. |
[24] |
Oetzel J. Smaller may be beautiful but is it more risky?assessing and managing political and economic risk in Costa Rica[J]. International Business Review,2005,14(6):765-790. |
[25] |
赵振宇,曾勇. 复杂环境下国际工程承包企业双元动态能力研究[J]. 建筑经济,2013(4):87-90. |